Single phase only. Guards recommended. This configuration is not recommended for applications prone to sludge buildup. Longer vertical lengths and flexible risers available, consult factory.
                    Unit of Measure
                    
               
        
            Specifications
- 1 Specify vertical length by adding height in inches after "R".
 - 2 Consult factory
 



