The Schedule 40 CPVC pipe is used to position accessories to adapter at desired depth. When requesting a quote please specify the pipe length desired in feet, because pricing is per foot of piping. Dry fit each piece together and set in place to check position in tank. After determining correct position, place small amount of cement to slip joints for future change. It is that simple!

1 - 1 of 1 | Results Per Page | View | Unit of Measure
1 

Item #

Pipe Length Desired In Feet

Price

Add To Cart/Request Quote
N/A QUOTE Add To Cart
Request Quote
1 - 1 of 1 | Results Per Page | View | Unit of Measure
1